Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site.... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Totalkare has installed a 15-metre vehicle inspection pit at Stagecoach South East’s Dover depot, enhancing the company’s ability to maintain and repair its fleet of buses.

Stagecoach South East plays a crucial role in the UK’s bus network, operating multiple depots and providing essential transport services to communities across the region.

Stagecoach bus at a station for service

The new inspection pit is designed to improve the efficiency and safety of maintenance tasks. Its construction includes robust 1,250mm wide walls made from thick welded steel, ensuring durability and long-term use. LED lighting has been installed to enhance visibility for engineers working in the pit, while the sloping floor with an integrated sump simplifies cleaning and waste management. The pit also features built-in storage for tools and equipment, a raised sliding platform for better vehicle access, and a detachable footbridge to facilitate safer movement for workers.

For handling heavy-duty tasks, the pit is equipped with a 20,000kg air-operated twin ram jack, capable of lifting large vehicles with ease. Additionally, an environmentally friendly waste oil drainer has been incorporated, aligning with Stagecoach’s commitment to sustainability and responsible waste management. The vehicle pit meets CE mark standards under EN 1090-1 Exc 2, demonstrating compliance with stringent safety and quality regulations.

Grahame Patterson, Engineering Director at Stagecoach South East, emphasised the positive impact of the installation on their operations. He highlighted how the new pit has improved efficiency and safety for the maintenance team.

Grahame Patterson said:

The new pit has enabled quicker turnaround times and improved working conditions for our engineers.

Brian Young, National Accounts Manager at Totalkare, underscored the collaborative nature of the project and its contribution to reducing downtime.

Brian Young said:

This installation complements the existing four pits at the site, further enhancing Stagecoach’s maintenance capabilities. We aimed to complete the work with minimal disruption, and it was great to work with the Stagecoach team.

The addition of this inspection pit reflects Stagecoach South East’s commitment to maintaining high standards of service and safety. By investing in infrastructure that supports efficient and reliable operations, the company continues to play a vital role in the UK’s transportation network, ensuring dependable service for the communities it serves.

This article was originally published by Totalkare Ltd.

Tags

Visit Supplier

Visit Supplier Website

Contact Totalkare Ltd

Address:

Block G1
Dandy Bank Road
Pensnett Trading Estate
Kingswinford
DY6 7TD
UK

Contact:

Call: +44 (0)121 585 2724

More News

Contact Totalkare Ltd

Use the form to get in touch with Totalkare Ltd directly to discuss any requirements you might have.










    We'd love to send you the latest news and information from the world of Bus-News. Please tick the box if you agree to receive them.

    For your peace of mind here is a link to our Privacy Policy.

    By submitting this form, you consent to allow Bus-News to store and process this information.